Historic Photographs

Home

Search

Subject Browse
Browse by Subject >>

State/City Browse
Alaska
Alabama
Arkansas
Arizona
California
Colorado
Connecticut
District of Columbia
Delaware
Florida
Georgia
Hawaii
Iowa
Idaho
Illinois
Indiana
Kansas
Kentucky
Louisiana
Massachusetts
Maryland
Maine
Michigan
Minnesota
Missouri
Mississippi
Montana
North Carolina
North Dakota
Nebraska
New Hampshire
New Jersey
New Mexico
Nevada
New York
Ohio
Oklahoma
Oregon
Pennsylvania
Rhode Island
South Carolina
South Dakota
Tennessee
Texas
Utah
Virginia
Vermont
Washington
Wisconsin
West Virginia
Wyoming


Home

>

Texas

>

Dallas

>

Atchison, Topeka & Santa Fe Control Tower 19, Santa Fe Railway Milepost 51, Dallas, Dallas County, TX



B&W Photos

HB1113358

HB1113359

HB1113360

HB1113361

HB1113362

HB1113363

HB1113364

HB1113365

HB1113366

HB1113367

HB1113368

HB1113369

HB1113370


Data Pages


Drawings


Photo Caption Pages


Item Title


Location
Santa Fe Railway Milepost 51, Dallas, TX

Find maps of Dallas, TX


Created/Published
Documentation compiled after 1968.

Notes
Survey number HAER TX-22
Unprocessed field note material exists for this structure (N9).
Building/structure dates: 1924 initial construction
Building/structure dates: 1932 subsequent work
Significance: Control Tower 19 is the best preserved example of three early twentieth century interlocking plants remaining in Dallas and Tarrant Counties. The tower and two one-story sheds are built in the Craftsman style, and comprise a complex which is representative of standardized service buildings which were constructed by the Atchison, Topeka, & Santa Fe Railroad (AT&AF) as well as other carriers west of the Mississippi. These buildings represent typical plan types which were generated by AT&SF company engineers and constructed by company crews along local and branch lines within the carrier's service area. Built with greater variation than the standard plans for stations and depots, interlocking plants were constructed to control the increasing rail traffic along the company's routes through Dallas and other major transfer hubs during the early twentieth century. The building of Control Tower 19 in 1924, coincided with a major reconstruction program which AT&SF undertook in the 1920's throughout its service area. Constructed initially with a manual interlocking system to work in tandem with a second plant (Control Tower 10), Control Tower 19 was retrofitted in 1932 with the more reliable electric interlocking system, supplied by the General Railway Signal Company of Rochester, New York. This consolidated the switching functions of both towers into one, and allowed AT&SF to raze Control Tower 10, thereby reducing its labor and maintenance costs. Control Tower 19 remained in service until 1922, after Santa Fe Railway sold this section of its Dallas subdivision to the Dallas Area Rapid Transit System (DART) in 1991.

Collection
Historic American Engineering Record (Library of Congress)

Contents


Back to Dallas, Texas