Historic Photographs

Home

Search

Subject Browse
Browse by Subject >>

State/City Browse
Alaska
Alabama
Arkansas
Arizona
California
Colorado
Connecticut
District of Columbia
Delaware
Florida
Georgia
Hawaii
Iowa
Idaho
Illinois
Indiana
Kansas
Kentucky
Louisiana
Massachusetts
Maryland
Maine
Michigan
Minnesota
Missouri
Mississippi
Montana
North Carolina
North Dakota
Nebraska
New Hampshire
New Jersey
New Mexico
Nevada
New York
Ohio
Oklahoma
Oregon
Pennsylvania
Rhode Island
South Carolina
South Dakota
Tennessee
Texas
Utah
Virginia
Vermont
Washington
Wisconsin
West Virginia
Wyoming

Home

>

Idaho

>

Scoville vicinity

>

Idaho National Engineering Laboratory, Idaho Chemical Processing Plant, Fuel Reprocessing Complex, Scoville, Butte County, ID



Data Pages


Photo Caption Pages


Item Title


Location
Fuel Reprocessing Complex, Scoville vicinity, ID

Find maps of Scoville, ID


Created/Published
Documentation compiled after 1968.

Notes
Survey number HAER ID-33-H
Building/structure dates: 1953 initial construction
Significance: For nearly four decades, the Fuel Reprocessing Complex (Buildings CPP-601, CPP-603, CPP-627, and CPP-640) at the Idaho Chemical Processing Plant (ICPP) recovered usable uranium from spent reactor fuel. The facility was constantly evolving to process new types of spent nuclear fuel and would eventually process materials from nearly 100 different reactors. Research and test reactors located at the National Reactor Testing Station supplied a large proportion of the fuel load for the facility, along with nearly all of the fuel cores that had powered the United States Navy's fleet of nuclear submarines and surface ships. Fuels clad in aluminum, zirconium, stainless steel, and graphite were routinely processed at the plant. Custom processing capabilities were also developed through the years and a variety of valuable isotopes and inert gases were isolated and shipped to research laboratories across the country. As ICPP scientists developed the facilities and skills necessary to reprocess highly enriched fuels from so many different sources, they also came up with many general improvements and scientific advances in fuel reprocessing techniques and waste management as a whole. In 1992, when changing political tides and lowered demand for uranium caused the Department of Energy to halt all fuel reprocessing efforts across the country, approximately 31,432 kg of uranium had been successfully recovered at the Idaho Chemical Processing Plant. The four main buildings that housed the complex fuel reprocessing operation now await decontamination and demolition.

Subjects
Nuclear Reactors
Cold War
Nuclear Facilities


Related Names
Foster Wheeler Corporation
Bechtel Corporation
U.S. Department Of Energy
Phillips Petroleum


Collection
Historic American Engineering Record (Library of Congress)

Contents
Photograph caption(s): 
SOUTH ELEVATION OF MAIN PROCESSING BUILDING (CPP-601) LOOKING NORTH. INL PHOTO NUMBER HD-22-5-3.Mike Crane, Photographer, 11/1998
SOUTH SECTION OF WEST ELEVATION OF MAIN PROCESSING BUILDING (CPP-601) LOOKING EAST. HEADEND PLANT BUILDING (CPP-640) APPEARS ON LEFT IN PHOTO. INL PHOTO NUMBER HD-22-3-3.Mike Crane, Photographer, 11/1998
NORTH SECTION OF WEST ELEVATION OF MAIN PROCESSING BUILDING (CPP-601) LOOKING EAST. HOT PILOT PLANT BUILDING (CPP-640) APPEARS IN RIGHT OF PHOTO. THE REMOTE ANALYTICAL FACILITY (CPP-627) WAS LOCATED ON CONCRETE PAD IN FOREGROUND. INL PHOTO NUMBER HD-54-33-3.Mike Crane, Photographer, 7/2006
EAST ELEVATION OF MAIN PROCESSING BUILDING (CPP-601) LOOKING NORTHWEST. MAINTENANCE SHOP AND OFFICE BUILDING (CPP-630) ON RIGHT IN PHOTO. INL PHOTO NUMBER HD-22-3-2.Mike Crane, Photographer, 11/1998
OBLIQUE PHOTO OF NORTH AND WEST ELEVATIONS OF REMOTE ANALYTICAL FACILITY (CPP-627) LOOKING SOUTHEAST. LABORATORY AND OFFICE BUILDING (CPP-602) APPEAR ON LEFT IN PHOTO. INL PHOTO NUMBER HD-22-2-2.Mike Crane, Photographer, 11/1998
NORTH AND WEST ELEVATIONS OF REMOTE ANALYTICAL FACILITY (CPP-627) LOOKING SOUTHEAST. HEADEND PLANT (CPP-640) APPEARS IN THE BACKGROUND. INL PHOTO NUMBER HD-22-1-4.Mike Crane, Photographer, 11/1998
WEST ELEVATION OF REMOTE ANALYTICAL FACILITY (CPP-627) AND HOT PILOT PLANT (CPP-640) LOOKING NORTHEAST. INL PHOTO NUMBER HD-22-2-1.Mike Crane, Photographer, 11/1998
SOUTH ELEVATION OF HOT PILOT PLANT (CPP-640) LOOKING NORTH. INL PHOTO NUMBER HD-22-3-1.Mike Crane, Photographer, 11/1998
NORTH ELEVATION OF HOT PILOT PLANT (CPP-640) LOOKING SOUTH AFTER REMOTE ANALYTICAL FACILITY (CPP-627) WAS REMOVED. PHOTO NUMBER HD-54-33-2.Mike Crane, Photographer, 7/2006
INTERIOR PHOTO OF MAIN PROCESSING BUILDING PROCESS MAKEUP AREA (CPP-601) LOOKING NORTH. PHOTO TAKEN FROM SOUTHWEST CORNER. INL PHOTO NUMBER HD-50-1-3.Mike Crane, Photographer, 6/2005
INTERIOR PHOTO OF MAIN PROCESSING BUILDING (CPP-601) PROCESS MAKEUP AREA LOOKING SOUTH. PHOTO TAKEN FROM CENTER OF WEST WALL. INL PHOTO NUMBER HD-50-1-4.Mike Crane, Photographer, 6/2005
INTERIOR PHOTO OF MAIN PROCESSING BUILDING PROCESS MAKEUP AREA (CPP-601) LOOKING NORTHWEST. PHOTO TAKEN FROM MIDDLE OF CORRIDOR. INL PHOTO NUMBER HD-50-2-3.Mike Crane, Photographer, 6/2005
INTERIOR PHOTO OF MAIN PROCESSING BUILDING PROCESS MAKEUP AREA (CPP-601) LOOKING SOUTH. PHOTO TAKEN FROM MIDDLE OF CORRIDOR. INL PHOTO NUMBER HD-50-3-2.Mike Crane, Photographer, 6/2005
INTERIOR PHOTO OF MAIN PROCESSING BUILDING PROCESS MAKEUP AREA (CPP-601) LOOKING SOUTHWEST. PHOTO TAKEN FROM NORTHEAST CORNER. INL PHOTO NUMBER HD-50-4-2.Mike Crane, Photographer, 6/2005
INTERIOR PHOTO OF HOT PILOT PLANT SECOND FLOOR WITH SOUTH SECTION OF SHIELDED CAVE IN FOREGROUND (CPP-640) LOOKING NORTHWEST. INL PHOTO NUMBER HD-54-40-1.Mike Crane, Photographer, 7/2006
INTERIOR PHOTO OF HOT PILOT PLANT SECOND FLOOR DEPICTING DETAIL OF SHIELDED CAVE (CPP-640) LOOKING SOUTHWEST. PHOTO TAKEN FROM NORTH. INL PHOTO NUMBER HD-54-40-2.Mike Crane, Photographer, 7/2006
CONSTRUCTION PROGRESS PHOTO SHOWING EXCAVATION PIT FOR MAIN PROCESSING BUILDING (CPP-601) LOOKING SOUTH. INL PHOTO NUMBER NRTS-50-693.Unknown Photographer, 1950
CONSTRUCTION PROGRESS PHOTO SHOWING EXCAVATION PIT FOR MAIN PROCESSING BUILDING (CPP-601) LOOKING NORTHWEST. INL PHOTO NUMBER NRTS-50-885.Unknown Photographer, 10/30/1950
CONSTRUCTION PROGRESS PHOTO SHOWING MAIN PROCESSING BUILDING (CPP-601) LOOKING NORTH. INL PHOTO NUMBER NRTS-51-1387.Unknown Photographer, 1/31/1951
CONSTRUCTION VIEW OF MAIN PROCESSING BUILDING (CPP-601) LOOKING NORTHWEST. INL PHOTO NUMBER NRTS-51-1390.Unknown Photographer, 1/31/1951
CONSTRUCTION VIEW OF MAIN PROCESSING BUILDING (CPP-601) LOOKING EAST. INL PHOTO NUMBER NRTS-51-1547.Unknown Photographer, 2/28/1951
AERIAL VIEW OF MAIN PROCESSING BUILDING SHOWING CONSTRUCTION PROGRESS AND EXCAVATION FOR LABORATORY ON LEFT. INL PHOTO NUMBER NRTS-51-1759.Unknown Photographer, 3/28/1951
CONSTRUCTION VIEW OF MAIN PROCESSING BUILDING (CPP-601) ON THE RIGHT AND LABORATORY (CPP-602) ON THE LEFT. INL PHOTO NUMBER NRTS-51-3373.Unknown Photographer, 9/28/1951
CONSTRUCTION PROGRESS PHOTO OF REMOTE ANALYTICAL FACILITY (CPP-627) SHOWING INITIAL EXCAVATION. INL PHOTO NUMBER NRTS-54-10703.Unknown Photographer, 5/21/1954
CONSTRUCTION PROGRESS PHOTO OF REMOTE ANALYTICAL FACILITY (CPP-627) SHOWING PLACEMENT OF PIERS. INL PHOTO NUMBER NRTS-54-11716.Unknown Photographer, 8/20/1954
CONSTRUCTION PROGRESS PHOTO OF REMOTE ANALYTICAL FACILITY (CPP-627). INL PHOTO NUMBER NRTS-54-12124.Unknown Photographer, 9/21/1954
CONSTRUCTION PROGRESS PHOTO OF REMOTE ANALYTICAL FACILITY (CPP-627). INL PHOTO NUMBER NRTS-54-12573.R.G. Larsen, Photographer, 10/20/1954
CONSTRUCTION PROGRESS PHOTO REMOTE ANALYTICAL FACILITY (CPP-627) SHOWING EMPLACEMENT OF ROOF SLABS. INL PHOTO NUMBER NRTS-54-13463.R.G. Larsen, Photographer, 12/20/1954
INTERIOR PHOTO OF THE REMOTE ANALYTICAL FACILITY OF SHIELDED GLOVE BOXES IN OPERATING CORRIDOR (CPP-627). INL PHOTO NUMBER NRTS-55-1524.Unknown Photographer, 1955
AERIAL SHOWING COMPLETED REMOTE ANALYTICAL FACILITY (CPP-627) ADJOINING FUEL PROCESSING BUILDING AND EXCAVATION FOR HOT PILOT PLANT TO RIGHT (CPP-640). INL PHOTO NUMBER NRTS-60-1221.J. Anderson, Photographer, 3/22/1960
CONSTRUCTION PROGRESS PHOTO OF HOT PILOT PLANT (CPP-640) LOOKING EAST SHOWING EXCAVATION AND FORMING; CONSTRUCTION 6 PERCENT COMPLETE. INL PHOTO NUMBER NRTS-59-4935.J. Anderson, Photographer, 9/21/1959
CONSTRUCTION PROGRESS PHOTO OF HOT PILOT PLANT (CP-640) LOOKING NORTHWEST SHOWING FORMING AND PLACEMENT OF REINFORCING STEEL FOR SOUTH WALLS OF CELLS 1, 3, 4 AND 5 AND WEST WALL FOR CELLS 1 AND 2; CONSTRUCTION 13 PERCENT COMPLETE. INL PHOTO NUMBER NRTS 59-6436.J. Anderson, Photographer, 12/18/1959
CONSTRUCTION PROGRESS PHOTO OF HOT PILOT PLANT (CPP-640) LOOKING NORTHWEST, SHOWING FORMING FOR NORTH WALLS OF CELLS 1, 4 AND 5; CONSTRUCTION 21 PERCENT COMPLETE. INL PHOTO NUMBER NRTS-60-1874.Holmes, Photographer, 4/21/1960
CONSTRUCTION PROGRESS PHOTO OF HOT PILOT PLANT (CPP-640) OVERALL VIEW LOOKING SOUTHEAST; CONSTRUCTION 34 PERCENT COMPLETE. INL PHOTO NUMBER NRTS-60-3034.Holmes, Photographer, 6/23/1960
CONSTRUCTION PROGRESS PHOTO OF HOT PILOT PLANT (CPP-640) LOOKING NORTHEAST SHOWING DECK FORMING FOR SOUTH SECTION OF OPERATING CORRIDOR; CONSTRUCTION 44 PERCENT COMPLETE. INL PHOTO NUMBER NRTS-60-3624.Holmes, Photographer, 7/25/1960
CONSTRUCTION PROGRESS PHOTO OF HOT PILOT PLANT (CPP-640) LOOKING NORTHEAST SHOWING OVERALL BLOCK EXTERIOR WALLS; CONSTRUCTION 65 PERCENT COMPLETE. INL PHOTO NUMBER NRTS-60-4976.Holmes, Photographer, 9/26/1960
FLOOR PLAN OF MAIN PROCESSING BUILDING (CPP-601), FIRST FLOOR SHOWING SAMPLE CORRIDORS AND EIGHTEEN CELLS AND ADJOINING REMOTE ANALYTICAL FACILITY (CPP-627) SHOWING REMOTE ANALYTICAL FACILITIES LAB, DECONTAMINATION ROOM, AND MULTICURIE CELL ROOM. TO LEFT ARE LABORATORY BUILDING (CPP-602) AND MAINTENANCE BUILDING (CPP-630). INL DRAWING NUMBER 200-0601-00-706-051979. ALTERNATE ID NUMBER CPP-E-1979.
FLOOR PLAN OF MAIN PROCESSING BUILDING (CPP-601), SECOND FLOOR SHOWING PROCESS MAKEUP AREA AND EIGHTEEN CELLS AND ADJOINING REMOTE ANALYTICAL FACILITY (CPP-627) SHOWING COLD LAB, DECONTAMINATION ROOM, MULTICURIE CELL ROOM, AND OFFICES. TO LEFT ARE LABORATORY BUILDING (CPP-602) AND MAINTENANCE BUILDING (CPP-630). INL DRAWING NUMBER 200-0601-00-706-051980. ALTERNATE ID NUMBER CPP-E-1980.
FLOOR PLAN OF MAIN PROCESSING BUILDING (CPP-601) BASEMENT SHOWING PROCESS CORRIDOR AND EIGHTEEN CELLS. TO LEFT IS LABORATORY BUILDING (CPP-602). INL DRAWING NUMBER 200-0601-00-706-051981. ALTERNATE ID NUMBER CPP-E-1981.
EAST AND WEST ELEVATIONS OF MAIN PROCESSING BUILDING (CPP-601). INL DRAWING NUMBER 200-0601-00-291-103081. ALTERNATE ID NUMBER 542-11-B-75.
SOUTH ELEVATION AND DETAILS OF MAIN PROCESSING BUILDING (CPP-601). INL DRAWING NUMBER 200-0601-00-291-103082. ALTERNATE ID NUMBER 542-12-B-76.
STRUCTURAL DETAILS AND SECTIONS OF MAIN PROCESSING BUILDING (CPP-601). INL DRAWING NUMBER 200-0601-00-291-103079. ALTERNATE ID NUMBER 542-11-B-73.
BUILDING DETAILS AND SECTIONS OF MAIN PROCESSING BUILDING (CPP-601). INL DRAWING NUMBER 200-0601-00-291-103080. ALTERNATE ID NUMBER 542-11-B-74.
PLAN SECTIONS AND DETAILS OF CELL HATCHES MAIN PROCESSING BUILDING (CPP-601). INL DRAWING NUMBER 200-0601-00-291-103256. ALTERNATE ID NUMBER 542-11-F-302.
EQUIPMENT LAYOUT OF MAIN PROCESSING BUILDING (CPP-601) L-CELL PLAN AND SECTION SHOWS COMPLEXITY OF CELLS. INL DRAWING NUMBER 200-0601-00-098-105687. ALTERNATE ID NUMBER 4289-20-301.
PLAN SECTIONS AND ELEVATIONS OF VESSEL SAMPLING STATIONS "P", "Q", "S" CELLS MAIN PROCESSING BUILDING (CPP-601). INL DRAWING NUMBER 200-0601-00-291-053694. ALTERNATE ID NUMBER CPP-E-1394.
FIRST FLOOR PLAN OF REMOTE ANALYTICAL FACILITY (CPP-627) SHOWING REMOTE ANALYTICAL LABORATORY, DECONTAMINATION ROOM, AND MULTICURIE CELL ROOM. INL DRAWING NUMBER 200-0627-00-008-105065. ALTERNATE ID NUMBER 4272-14-102.
SECOND FLOOR PLAN OF REMOTE ANALYTICAL FACILITY (CPP-627) WARM LABORATORY ROOM, DECONTAMINATION ROOM, HOT CHEMISTRY LABORATORY, AND MULTICURIE CELL ROOM. INL DRAWING NUMBER 200-0627-00-098-105066. ALTERNATE ID NUMBER 4272-14-103.
EAST AND WEST ELEVATIONS OF REMOTE ANALYTICAL FACILITY (CPP-627). INL DRAWING NUMBER 200-0627-00-098-105067. ALTERNATE ID NUMBER 4272-14-104.
NORTH AND SOUTH SECTIONS OF REMOTE ANALYTICAL FACILITY (CPP-627). INL DRAWING NUMBER 200-0627-00-098-105068. ALTERNATE ID NUMBER 4272-14-105.
MISCELLANEOUS ARCHITECTURAL DETAILS OF REMOTE ANALYTICAL FACILITY (CPP-627). INL DRAWING NUMBER 200-0627-00-098-105631. ALTERNATE ID NUMBER 4272-814-134.
MISCELLANEOUS ARCHITECTURAL DETAILS AND SECTIONS OF REMOTE ANALYTICAL FACILITY (CPP-627). INL DRAWING NUMBER 200-0627-00-098-105632. ALTERNATE ID NUMBER 4272-814-135.
EAST WEST NORTH ELEVATIONS OF MULTICURIE CELL ARCHITECTURAL DETAILS REMOTE ANALYTICAL FACILITY (CPP-627). INL DRAWING NUMBER 200-00627-00-706-050245. ALTERNATE ID NUMBER AED-D-245.
DETAILS OF REMOTE ANALYTICAL FACILITY (CPP-627). INL DRAWING NUMBER 200-0627-00-098-105071. ALTERNATE ID NUMBER 4272-14-108.
ARCHITECTURAL FLOOR PLAN OF OPERATING AREA HOT PILOT PLANT (CPP-640). INL DRAWING NUMBER 200-0640-00-279-111678. ALTERNATE ID NUMBER 8952-CPP-640-A-1.
ARCHITECTURAL FLOOR PLAN OF PROCESS AND ACCESS AREAS HOT PILOT PLANT (CPP-640). INL DRAWING NUMBER 200-0640-00-279-111679. ALTERNATE ID NUMBER 8952-CPP-640-A-2.
ARCHITECTURAL ROOF PLAN AND WEST-SOUTHEAST ELEVATIONS OF HOT PILOT PLANT (CPP-640). INL DRAWING NUMBER 200-0640-00-279-111680. ALTERNATE ID NUMBER 8952-CPP-640-A-3.
ARCHITECTURAL SECTIONS A, B, C, D, OF HOT PILOT PLANT (CPP-640). INL DRAWING NUMBER 200-0640-00-279-111681. ALTERNATE ID NUMBER 8952-CPP-640-A-5.
ARCHITECTURAL WALL SECTIONS OF HOT PILOT PLANT (CPP-640). INL DRAWING NUMBER 200-0640-00-279-111682. ALTERNATE ID NUMBER 8952-CPP-640-A-5.
ARCHITECTURAL DOOR DETAILS AND SCHEDULE OF HOT PILOT PLANT (CPP-640). INL DRAWING NUMBER 200-640-00-279-111683. ALTERNATE ID NUMBER 8952-CPP-640-A-6.
MISCELLANEOUS ARCHITECTURAL DETAILS OF HOT PILOT PLANT (CPP-640). INL DRAWING NUMBER 200-640-00-279-111684. ALTERNATE ID NUMBER 8952-CPP-640-A-7.
OBLIQUE PHOTO OF NORTH ELEVATION OF FUEL STORAGE BUILDING (CPP-603). PHOTO TAKEN LOOKING SOUTH. INL PHOTO NUMBER HD-54-14-3.Mike Crane, Photographer, 8/2005
OBLIQUE PHOTO OF NORTHWEST CORNER OF FUEL STORAGE BUILDING (CPP-603). PHOTO TAKEN LOOKING SOUTHEAST. INL PHOTO NUMBER HD-54-14-4.Mike Crane, Photographer, 8/2005
0BLIQUE PHOTO OF EAST ELEVATION OF FUEL STORAGE BUILDING (CPP-603). PHOTO TAKEN LOOKING WEST. INL PHOTO NUMBER HD-54-15-1.Mike Crane, Photographer, 8/2005
WEST ELEVATION OF FUEL STORAGE BUILDING (CPP-603). PHOTO TAKEN LOOKING NORTHEAST. INL PHOTO NUMBER HD-54-20-1.Mike Crane, Photographer, 8/2005
WEST ELEVATION OF FUEL STORAGE BUILDING (CPP-603). PHOTO TAKEN LOOKING NORTHEAST. INL PHOTO NUMBER HD-54-20-3. Mike Crane, Photographer, 8/2005
SOUTH ELEVATION OF IRRADIATED FUEL STORAGE FACILITY LOCATED IN FUEL STORAGE BUILDING (CPP-603). PHOTO TAKEN LOOKING NORTH. INL PHOTO NUMBER HD-54-15-2.Mike Crane, Photographer, 8/2005
NORTHERN PORTION OF WEST ELEVATION OF FUEL STORAGE BUILDING (CPP-603). PHOTO TAKEN LOOKING SOUTHEAST. INL PHOTO NUMBER HD-54-20-2.Mike Crane, Photographer, 8/2005
NORTHERN PORTION OF WEST ELEVATION OF FUEL STORAGE BUILDING (CPP-603). PHOTO TAKEN LOOKING NORTHEAST. INL PHOTO NUMBER HD-54-20-4.Mike Crane, Photographer, 8/2005
NORTH ELEVATION OF IRRADIATED FUEL STORAGE FACILITY LOCATED IN FUEL STORAGE BUILDING (CPP-603). PHOTO TAKEN LOOKING SOUTH. INL PHOTO NUMBER HD-54-16-1.Mike Crane, Photographer, 8/2005
VIEW OF TRANSFER BASIN CORRIDOR OF FUEL STORAGE BUILDING (CPP-603). PHOTO TAKEN LOOKING NORTH. INL PHOTO NUMBER HD-54-17-2.Mike Crane, Photographer, 8/2005
VIEW OF CRANE LOADING AND UNLOADING AREA OF FUEL STORAGE BUILDING (CPP-603). PHOTO TAKEN LOOKING SOUTH. INL PHOTO NUMBER HD-54-17-1.Mike Crane, Photographer, 8/2005
VIEW OF CRANE LOADING AND UNLOADING AREA OF FUEL STORAGE BUILDING (CPP-603). PHOTO TAKEN LOOKING NORTH. INL PHOTO NUMBER HD-54-17-4.Mike Crane, Photographer, 8/2005
VIEW OF MIDDLE STORAGE BASIN NUMBER 2 OF FUEL STORAGE BUILDING (CPP-603). PHOTO TAKEN LOOKING NORTHEAST. INL PHOTO NUMBER HD-54-17-3.Mike Crane, Photographer, 8/2005
VIEW OF SOUTH STORAGE BASIN NUMBER 1 OF FUEL STORAGE BUILDING (CPP-603). PHOTO TAKEN LOOKING NORTHEAST. INL PHOTO NUMBER HD-54-18-4.Mike Crane, Photographer, 8/2005
VIEW OF FECF HOT CELL OF FUEL STORAGE BUILDING (CPP-603). PHOTO TAKEN LOOKING NORHTWEST. INL PHOTO NUMBER HD-54-18-3.Mike Crane, Photographer, 8/2005
EAST/WEST TRUCK BAY AREA OF TRANSFER BASIN CORRIDOR OF FUEL STORAGE BUILDING (CPP-603). PHOTO TAKEN LOOKING NORTHWEST. INL PHOTO NUMBER HD-54-19-1.Mike Crane, Photographer, 8/2005
INTERIOR OF SECOND FLOOR CONTROL ROOM OF FUEL STORAGE BUILDING (CPP-603). PHOTO TAKEN LOOKING SOUTHWEST. INL PHOTO NUMBER HD-54-19-2.Mike Crane, Photographer, 8/2005
CONSTRUCTION PROGRESS PHOTO SHOWING WEST STORAGE BASIN AT FUEL STORAGE BUILDING (CPP-603). INL PHOTO NUMBER NRTS-51-689.Unknown Photographer, 1950
CONSTRUCTION PROGRESS PHOTO SHOWING FUEL STORAGE BUILDING (CPP-603) LOOKING NORTHWEST. INL PHOTO NUMBER NRTS-50-895.Unknown Photographer, 10/30/1950
CONSTRUCTION PROGRESS PHOTO SHOWING EMPLACEMENT STEEL BEAMS FUEL STORAGE BUILDING (CPP-603) LOOKING EAST. INL PHOTO NUMBER NRTS-51-1371. Unknown Photographer, 1/31/1951
CONSTRUCTION VIEW FUEL STORAGE BUILDING (CPP-603) LOOKING EAST SHOWING ASBESTOS SIDING. INL PHOTO NUMBER NRTS-51-1543.Unknown Photographer, 2/28/1951
INTERIOR VIEW OF FUEL STORAGE BUILDING (CPP-603) LOOKING SOUTHWEST SHOWING STORAGE BASIN IN FOREGROUND, TRANSFER CRANE AND UNLOADER TO LEFT OF NORTH SIDE OF HOT CELL. INL PHOTO NUMBER NRTS-58-157.J. Anderson, Photographer, 1/15/1958
INTERIOR VIEW OF FUEL STORAGE BUILDING (CPP-603) SHOWING CRANE ASSEMBLY FOR TRANSFER PIT. INL PHOTO NUMBER NRTS-51-2404.Unknown Photographer, 5/31/1951
BUILDING PLANS OF FUEL STORAGE BUILDING (CPP-603). INL DRAWING NUMBER 200-0603-61-299-103029. ALTERNATE ID NUMBER 542-31-B-21.
SOUTH, EAST, NORTH ELEVATIONS AND SECTIONS OF FUEL STORAGE BUILDING (CPP-603). INL DRAWING NUMBER 200-0603-61-299-103030. ALTERNATE ID NUMBER 542-31-B-22.
WEST ELEVATIONS AND SECTIONS OF FUEL STORAGE BUILDING (CPP-603). INL DRAWING NUMBER 200-063-61-299-103031. ALTERNATE ID NUMBER 542-31-B-23.
MISCELLANEOUS SECTIONS AND DETAILS OF FUEL STORAGE BUILDING (CPP-603). INL DRAWING NUMBER 200-0603-61-299-103032. ALTERNATE ID NUMBER 542-31-B-24.
SIDING AND ROOF DETAILS OF FUEL STORAGE BUILDING (CPP-603). INL DRAWING NUMBER 200-0603-61-299-103033. ALTERNATE ID NUMBER 542-31-B-25.
PLOT PLAN OF FUEL STORAGE BUILDING (CPP-603) SHOWING STORAGE BASINS AND PROPOSED LOCATION OF FUEL ELEMENT CUTTING FACILITY. INL DRAWING NUMBER 200-0603-00-706-051287. ALTERNATE ID NUMBER CPP-C-1287.
PLAN VIEW OF FUEL STORAGE BUILDING (CPP-603) SHOWING STORAGE BASINS. INL DRAWING NUMBER 200-0603-00-706-051285. ALTERNATE ID NUMBER CPP-D-1285.
FACILITY LAYOUT OF FUEL STORAGE BUILDING (CPP-603) SHOWING STORAGE BASINS, FUEL ELEMENT CUTTING FACILITY, AND DRY GRAPHITE STORAGE FACILITY. INL DRAWING NUMBER 200-0603-00-030-056329.
EAST ELEVATION OF HIGH BAY ADDITION OF FUEL STORAGE BUILDING (CPP-603). INL DRAWING NUMBER 200-0603-00-706-051286.


Back to Scoville vicinity, Idaho